|
||||
Unload Friday.
We arrived just on lunchtime at the railway. Herre was the last time I moved forward and Andrew took over the truck to expertly reverse the trailer into the loading area. Once the 4 graincars were unloaded he took the trailer away, unhiotched it and came back to unload the truck. And thus the long unload occurred. some had been done before Andrew and myself got there. Friday was mainly a unpack and initial run day. We got all the train unloaded and took most of the carriages up to Museum loop to store and sort them out. As usual it was fasinating to see all the different locos. |