Planning a new train room
Previous Update
HOME

Next Update
The big picture:
Update 26th February 2018




I have been ultra lazy and have in the last week or so done 3 updates but on youtube. So thought I should update the weebsite with links for you to watch.

dthead is my youtube name so you can always search for that too.





I also did a small video on the JMRI as it is: jmri overview




Last night I finished that goods road at Daboola. A small milestone as it now means the track on the visable part of the layout is laid fully.

But only laid. I still have heeps of wiring to do to all the track. Then point motor installation, and wiring them up too.





Well Note I said on the visable layout, for there is still track and points to be installed. In the lower staging. There are some storage roads are to be put in. There are two Railmotor sidings, and 2 "xpt" sidings. The siding on the far right also needs fixing. It is a "universal industry". Since it is offstage I can shunt wagons in there without worrying about making suitable building/infrastructure.



Previous Update
HOME

Next Update



Page written & maintained by David Head. dthead@hotmail.com