Planning a On30 Railway
Previous Update
HOME

Next Update


The big picture:
Update 4th January 2014




Yes it has taken a year, but an update.

You can see by the photo above 10 points, 4 Left hand and 6 right hand. They were made while up here in Brisbane, and had lots of time. They are number 7 points using code 100 rail. Were mainly built off a paper jig I printed off thast started life as a fastrack #7 HO point. I then got the measurements of PBR sleeper size and spacing.I then altered the points to suit.

The sleeper size are not right, still too big, but the gauge works out so several paper copies have been used to make my points.

Have also made a jig to make some stright track, still to finish it. As I solder circuitboard sleeper, hand cut, I'll make every 5th a cuicuit board sleeper, and the rest perhaps balsa. Then paint up ready for the nextr stage in the layout's slow march....

Untill next time gents&ladies
Previous Update
HOME

Next Update



Page written & maintained by David Head.
david@nmit.vic.edu.au