Update 10th April 2016 |
Taking thibgs slowly at the moment. But still some progress. First upis the Broughton "B" Box end. I decided to put in a smaller temporary panel rather thena the old bulky set of black keyswitches that acted like a lever frame. This panel has 4 slide switches and does the job. |
||
Well I have been busy - for me - in getting more of the "electronic staff" in use. These two shots show the original one "Upper staging - Daboola" above the newly working "Warren Loop - JJ Loop". |
||
"Graceton - Warren Loop" has been done as well, with the recesed unit at Graceton. |
||
"Eyeseeh - Broughton" has been done as well, the Broughton end is temporary until the fascia is done. |
||
"Daboola-Graceton" was the last section done for now. There are other sections to be done. These will be done eventually, have to make the panels up. The existing panels need theoir sectiopn names labelled as well. Two panels will be biger - ie junction panels. |
||
There are other sections to be done. These will be done eventually, have to make the panels up. The existing panels need theoir sectiopn names labelled as well. Two panels will be biger - ie junction panels. It does mean I'd expect people to start using the system now that it is around the room more. After all it is a safeworking system, and that is part of operating a railway. YOU HAVE BEEN WARNED :) |
||
I have done other things. did some s,mall gap gilling at Eyeseeh. Meanwhile in the yard, the doubleslip is motorised properly. Other yard points are being looked at as I type. |
||