The Costerfield Line - Rebuilding the Great Caravan Railway
Home | Back to plans

24th May 2008

Another dirt digging development down in the terrific trainroom.......

( we hope 95+% of the dirt is now gone )

Next will be the developemnt of that frame which holds two staging loops and a 2 turn helix. And the boxing and sealign of this area.



Page written & maintained by David Head.
david@nmit.vic.edu.au