The Costerfield Line - Rebuilding the Great Caravan Railway
Home

Here is a plan that I have been meaning of trying- with some modifications.
I have played with Costerfield, so the staging is under the station. The pier now depart the yard and has plenty of length to get under the mainline to the pier. It also stops the line being used for a headshunt.

The loads in/empties out leaves the pier, with an optional wye. The loads in/out now climbs steeply into Greytown. It eliminates the mine as a seperate operational point(a plus as it would be easily handled by Greytown's operator).




Page written & maintained by David Head.
david@nmit.vic.edu.au